Use Case Examples¶
Prerequisite
The charts have been created in the dashboard, and now links need to be added to the charts.
Using Variables¶
Example of jumping to another view:
Step One: Add Chart Link¶
- Define the name as “CPU Usage”;
-
Configure the link address based on the preset link and parameters. As shown in the figure, define the parameters:
dashboard_id
isdsbd_b1e00afaa3b14f5e8e259280c8*****
name
isCPU loads
- Add the time variable
#{TR}
in the link address and add the parametertime
, defined as1h
(last 1 hour)
-
Select the opening method as “side slide page”;
- Confirm.
Step Two: Verify Link Jump¶
- After adding the link, select a specific time point in the chart;
- Click the configured “CPU Usage” link;
- Open the target view via side slide.
Without Using Variables¶
Example of jumping to an external help document:
Step One: Add Chart Link¶
- Define the name as “help docs”;
- Directly paste the external URL you want to jump to. For example,
https://docs.guance.com/scene/visual-chart/chart-link/
; - Select the opening method as “side slide page”;
- Confirm.
Step Two: Verify Link Jump¶
- After adding the link, select a specific time point in the chart;
- Click the configured “help docs” link;
- Open the target link via side slide.