Skip to content

Use Cases


Prerequisites

Charts have been created in the dashboard, and now links need to be added to the charts.

Using Variables

Take jumping to another view as an example:

  1. Define the name "CPU Usage";
  2. Configure the link address based on the preset link and parameters. As shown in the figure, define parameters:

    • dashboard_id as dsbd_b1e00afaa3b14f5e8e259280c8*****
    • name as CPU loads
    • Add the time variable #{TR} to the link address, and add the parameter time, defined as 1h (last 1 hour)
  3. Select the opening method as "Side Slide";

  4. Confirm.

  1. After the link is added, select a certain time point in the chart;
  2. Click the configured "CPU Usage" link;
  3. Open the target view with a side slide.

Not Using Variables

Take jumping to an external help document as an example:

  1. Define the name "help docs";
  2. Directly paste the external URL to jump to. As shown in the figure https://docs.guance.com/scene/visual-chart/chart-link/;
  3. Select the opening method as "Side Slide";
  4. Confirm.

  1. After the link is added, select a certain time point in the chart;
  2. Click the configured "help docs" link;
  3. Open the target link with a side slide.

Feedback