Use Cases¶
Prerequisites
Charts have been created in the dashboard, and now links need to be added to the charts.
Using Variables¶
Take jumping to another view as an example:
Step 1: Add Chart Link¶
- Define the name "CPU Usage";
-
Configure the link address based on the preset link and parameters. As shown in the figure, define parameters:
dashboard_idasdsbd_b1e00afaa3b14f5e8e259280c8*****nameasCPU loads- Add the time variable
#{TR}to the link address, and add the parametertime, defined as1h(last 1 hour)
-
Select the opening method as "Side Slide";
- Confirm.
Step 2: Link Jump Verification¶
- After the link is added, select a certain time point in the chart;
- Click the configured "CPU Usage" link;
- Open the target view with a side slide.
Not Using Variables¶
Take jumping to an external help document as an example:
Step 1: Add Chart Link¶
- Define the name "help docs";
- Directly paste the external URL to jump to. As shown in the figure
https://docs.guance.com/scene/visual-chart/chart-link/; - Select the opening method as "Side Slide";
- Confirm.
Step 2: Link Jump Verification¶
- After the link is added, select a certain time point in the chart;
- Click the configured "help docs" link;
- Open the target link with a side slide.